With factory installed Lits, which automatically included level control feature, that is correct; but it does not apply to post delivery installed units, which can only swing up to fill in the high beams, or remain stationary.
In your case, a PST II or PIWIS is needed to setup the atuo level system.
__________________
“Anything really new is invented only in one’s youth. Later, one becomes more experienced, more famous – and more stupid.” - Albert Einstein
Last edited by JFP in PA; 11-26-2012 at 10:01 AM.
|