View Single Post
Old 04-02-2013, 09:37 PM   #12
986_c6
Registered User
 
Join Date: Jan 2011
Location: Peoples Republic of Kaliforneea
Posts: 686
[QUOTE=coreseller;334290]It really was pretty simple. There is a 4" to 6" layer of gravel between the concrete floor and the mud / clay ground. After we cut and dug out the concrete, gravel then mud to a depth of 14" to 16" to accommodate a minimum of 7" worth of poured concrete, the "tunnel" for the PVC pipe was easily made by inserting the empty pipe through the gravel and withdrawing it and emptying it. Then using an immense Bosch hammer drill with a 2" coring bit (it's good to have friends in the business) drill the hole straight down where you want the pump, once you're through glue the 90 degree end on the PVC and push it through the "tunnel" aligning it with the newly cut hole. Once there, slather some glue on the upright PVC and push it into the 90 and twist, done. I will admit I pined awhile prior but that part of the project proved to be anticlimactic.

[

Uh, huh... here is the check and call me when it is done
__________________
02 Boxster (DD sans kids)
03 Dodge Ram Quad Cab (Stuff hauler)
06 Maserati Coupe Cambiocorsa (Personal weekend car)
06 Maserati Quattroporte (Family hauler)
08 Corvette Z06 (Track car)
986_c6 is offline   Reply With Quote