View Single Post
Old 04-15-2023, 08:41 AM   #8
Homeoboxter
Registered User
 
Join Date: Oct 2018
Location: North Cali
Posts: 820
Garage
If you have a durametric, Foxwell tool or similar, you can constantly monitor the readiness monitors while driving. This way you can make sure they are done when you go for the test and it`ll pass. It takes like 15-30 miles until all the readiness monitors pass, with the exception of the SAI. Here, in Caliornia, the EVAP system readiness is not a requirement, the rest is. For me the longest was the SAI system to get done, because it requires 3 start cycles if I remember correctly and the engine has to cool down between the cycles, so it took 3 days to get that ready.
Homeoboxter is offline   Reply With Quote