Pressure pressure pressure! Well the good news is those blades are done already. Last count Andy and I did on them was 180 (e.g. two per kit, meaning we have enough for 90 kits already machined). And I bet we'll never need 90 lolllll we'll see
Coming week is off to the PWM box machining and assembly! And LED strips assembly is goes fast.
May 2015, those SkyBreaker goes wild and in the express mail to you guys. Promise!
__________________
______________________________
'97 Boxster base model 2.5L, Guards Red/Tan leather, with a new but old Alpine am/fm radio.
|