Today I changed tires, inspected the brakes and undercarriage, new front rotors and pads (caliper boots looking ratty), charged my gps datalogger, loaded spares and safety gear, all ready for Spring Mountain NV with Patrick Long.
Tires and brakes went quick with no snags. 2 hrs total time.
__________________
2009 Cayman 2.9L PDK (with a few tweaks)
PCA-GPX Chief Driving Instructor-Ret.
|