Quote:
Originally Posted by Newsguy
When I installed my two-post, I had to cut out a section of the floor on each side as it was only about 2' thick. I then dug down about two feet and we put in rebar and filled with what I believe is termed "six-bag" concrete. It will be there when the Sun swallows the Earth!
I've moved from there (and miss my lift nearly every day) and considering another. I hope I don't need to repeat the whole process. Cutting concrete is messy!
|
I observed a 2-poster in action last night. I'm convinced they're the most economical (well, relatively) solution.
-30-
__________________
2000 986 base
Arctic Silver/black
2.7 liter
5-speed manual
Last edited by LoneWolfGal; 10-30-2024 at 12:00 PM.
|