Remove the belt, push the car down the driveway, turn it around, then start the car and get it up the driveway with total run time of less than 5 seconds.
__________________
DD summer/winter: 2000 Boxster S
DD spring/fall: 914-6 w/ 3.0L SC Dual Webers
http://imgur.com/a/k0Wtl - My 914-6 Build/Project Story
|