View Single Post
Old 03-23-2017, 11:31 AM   #13
bwdz
Registered User
 
Join Date: May 2016
Location: Northville, MI
Posts: 249
It would clear up a lot of things if you posted up the itemized bill with parts and labor charges. Some shops do rip you off by charging extra labor, what I mean by that is they charge the book hours for each part even though half the work may already be done by installing the part that is in the way of that one. There should only be a charge for one part if another part needs replacing but it is required that the particular part had to be removed anyway and reinstall in the process or replacing the part behind it. I know this sounds confusing but let's just say you're doing a water pump on a car, well you can't charge additional labor for replacing the belt even if you are installing a new one because the labor in replacing the water pump already included belt removal and reinstallation.
bwdz is offline   Reply With Quote