
The crank carrier with one of the rods for bank 2 installed.

Crank carrier installed into bank 1:

And both block halves joined together ready for the real fun that comes next, installation of pistons 4-6

Another homemade tool, this one for inspecting the proper installation of piston bolt and circlip.