View Single Post
Old 11-24-2015, 06:04 PM   #2197
Sassmatt72
Registered User
 
Join Date: Mar 2015
Location: Santa Clara ca
Posts: 363
Exclamation Sacrilege... I gained foot room...ask me how

Danger, Sacrilege and advanced modification ahead.

So I rotated the fuse box up to the lip the OBDI-II port is on...

I hope my fuses don't fall out now it's facing down.

so.
moved the port elsewhere. used it's hole towards the middle and drilled a second 3" towards middle, re-used it's screws into two holes the carpeted cover screwed into, cut a bit of the ziptie channel off...

Had to massage the air duct a bit to squeez the box up there, but it's soft plastic.
took a bit to gently and slowly flex the wiring loom into the new position
(removed old wrapping, & combed it w/ my fingers)

easier w a heat gun I'd think (but carefully) on duct.
them trim down side cover to a sliver to protect the loom from your foot on entry.

To do it again, I'd heat the wiring loom a bit too when flexing it into new location.

then wrap in tape.

now a totally hidden fuse box, and tons more foot space.
Sassmatt72 is offline   Reply With Quote