| 
	
		
		
		
		 
			Details of the rebuild: 
Everything touched was cleaned and repainted as necessary 
Heads sent out .010 out of flat corrected, new seals installed, valve job 
All timing chains replaced 
Chain ramps replaced 
Main Bearings replaced 
Thrust bearings replaced 
Rod bearings replaced 
Clutch disc replaced 
Clutch pivot in transmission replaced 
Engine seals replaced 
Air oil separator replaced 
Pistons and rings cleaned.  Original piston rings reused 
Plastic balance tube replaced 
Intermediate shaft replaced with a modified IMS to reduce the chance of IMSB failure 
Pelican parts IMS bolt/sealing parts used 
Nachi high temp Viton sealed IMS bearing installed 
New connecting rod bolts 
New front motor mount 
 
Non engine items: 
New horns 
Both window regulators fixed with the bicycle cable adjuster trick 
Birds nests and other trash deleted from the front radiators 
Broken plastic tabs on the rear wing plastic cover glued with epoxy and plastic cover re-installed 
Headlights polished to remove yellow haze 
Car detailed
		 
		
		
		
		
		
		
			
				__________________ 
				2003 S manual
			 
		
		
		
		
	 |