Finished getting the AEM Gauges installed.
Here I installed the wood veneer from a kit I had. This is the piece that would normally be used to
surround the cassette or CD holder.
In this pic, I cut two pieces of wood to fill in the center section. I used a dremel to grind the extra off.
Here's a couple of shots with the completed install. Chose the silver bezels to match the main gauges.
You can see how the Apexi AFC slides out and into the pocket I built.
Here's the install of the Boost Gauge sensor. I will install the Wide Band O2 sensor once I install the
200 Cell Fabspeed Cats next week.
The Boost Gauge sensor then attaches to the vacuum line upstream of the throttle body.