Thread: Rear Track Arms
View Single Post
Old 09-09-2013, 06:17 PM   #11
evo-r
Registered User
 
evo-r's Avatar
 
Join Date: Mar 2013
Location: Long Island, NY
Posts: 378
Quote:
Originally Posted by Chard View Post
After doing the job on a driveway on jackstands, I would say a shop could do both sides on a lift in 2 hours. 3 would be the most I'd pay.

It was a fairly easy install. The 2nd side took less than half the time the first side did.
Is this something that a somewhat handy guy can do himself? What's the most difficult part of the job? Any special tools needed? One man job? Thanks!
__________________
His: 2003 Boxster & 2008 MDX
Hers: 2011 Golf TDI
evo-r is offline   Reply With Quote