View Single Post
Old 05-29-2013, 02:44 AM   #7
PhilNZ
Registered User
 
Join Date: May 2013
Location: New Zealand
Posts: 15
Garage
Thanks good post..I finished my IMS Guardian install today. Did it in 4 stages and combined it with some routine maintenance. I drove the car regularly between each stage and it took me about about 3 weeks total time, about half a day each stage.

Stage 1 MCD install, sump inspect, oil and filter change, used oil analysis.
Stage 2 Switch install and connect wires to fuse box.
Stage 3 Thread wires into engine compartment, air filter change, power steering fluid check.
Stage 4 Connect wires to MCD unit secure wiring under car, cabin filter change.

All good, car running well. Thanks Jake for a great idea and kit for monitoring our engines.
__________________
2004 Boxster S
Suzuki Grand Vitara 2.5LV6 / Nissan Elgrand 3.3L V6
Ducati 900SSie / Ducati Pantah 600SL (race bike)
PhilNZ is offline   Reply With Quote