View Single Post
Old 03-11-2011, 10:12 AM   #44
boxster6354
Registered User
 
boxster6354's Avatar
 
Join Date: May 2007
Location: Kingwood, TX
Posts: 445
Garage
Quote:
Originally Posted by Johnny Danger
I would be more concerned if this project had been turned around within the very short time frame that they had initially quoted you - than things taking more time in order to get them right . Remember, what Dr. Leo Marvin told Bob, "baby steps" !
If I had to do it over again I would not mind a month wait if needed.

I had dropped my Box off at a shop with good standings and they quoted me three days +/- 2 to place and paint my body kit of front bumper rear deck lid and spoiler along with side skirts.

Called me to pick up on the third day as promised and the work and fit was crap, had to have them go back over a few time to make it "almost" right.

They did not even do a pre-fit before painting!

Count your blessings that they are taking their time it will pay off in the end.
boxster6354 is offline   Reply With Quote